IT Pro Expert
Search
IT PRO EXPERT

Solar and Green Advisory

Independent solar, battery and green energy advice. We check quotes before you sign, inspect installations after they're fitted, and specialise in off-grid systems. We don't sell or recommend installers, so our only interest is whether the job is right.

Solar advisory and inspection

  • Quote and design review: sizing, components, pricing and generation estimates checked before you commit.
  • Installation inspection: confirm what's fitted matches what you paid for and has been installed properly.
  • Heat pumps and green energy: specialist advice on heat pumps, batteries and how they work alongside solar.
  • Off-grid specialists, with our own off-grid solar management software available on enquiry.
£0installer commissions or referral fees
MCS & BS 7671standards we check against
24/7critical support

Independent by design

IT Pro Expert is a solar advisory and inspection service for businesses throughout the UK. We don't install systems, we don't recommend installers and we don't take referral fees. That means we can tell you plainly whether a quote is good value, whether a system is sized for how you actually use power, and whether an installation has been done correctly.

Our specialist knowledge covers solar PV, LiFePO4 battery storage, hybrid and off-grid inverters, heat pumps and the wider mix of green energy technology. Whoever you choose to install, we can review their work at any stage.

Solar panel installation being inspected

What we check

  • System sizing against your real consumption, ideally from half-hourly meter data
  • Panel, inverter and battery choice, including datasheets, warranties and usable battery capacity
  • String design and inverter compatibility, including MPPT voltage and current limits
  • Generation and savings estimates, checked for realistic UK assumptions
  • Pricing against current market rates for equipment and labour
  • DC and AC isolation, cable sizing, protection and earthing concerns raised against BS 7671
  • MCS certification, DNO notification (G98/G99) and handover documentation
  • Heat pump design, including heat loss calculations, flow temperatures and emitter sizing

Can you check my solar quote before I sign?

Yes. Send us the quote, the equipment datasheets, a few photos of the roof or site, and your electricity usage (half-hourly data if you can get it). We'll check whether the system is the right size, whether the components are good quality and suited to each other, whether the price is fair, and whether the generation and savings figures stand up. You get a written summary with anything that needs questioning before you commit.

Can you inspect an installation that's already been fitted?

Yes. We'll compare what's on site with what was quoted, look over the installation and paperwork, and check performance data if the system isn't producing what was promised. If we find problems, our written report gives you something clear and specific to take back to your installer. This is an independent technical review, not an electrical installation certificate; where formal testing is needed, we'll tell you.

Do you recommend installers?

No, and that's deliberate. Recommending installers, or taking a fee for introductions, would compromise the one thing we offer: an opinion that isn't tied to a sale. We're happy to review quotes from as many installers as you like and help you compare them on a like-for-like basis.

Do you advise on heat pumps and other green energy?

Yes. A heat pump only performs well if it's sized from a proper heat loss calculation and paired with suitable radiators or underfloor heating at a sensible flow temperature. We review heat pump designs and quotes, and advise on how heat pumps, solar and batteries work together, including scheduling heating and battery charging around time-of-use tariffs.

Is a battery-only system worth it?

It can be. Batteries charged overnight on a cheap tariff and used during the day can cut costs substantially and double as a UPS (uninterruptible power supply) during power cuts. How much you save depends on the gap between your night and day rates and how much power you use in the day, so we model it against your actual usage rather than quoting a headline figure.

Off-grid solar in the UK: what should you expect?

Off-grid is where we have the deepest experience, and where a poorly designed system costs the most. From April to September a well-designed solar and battery system can carry most sites with little or no grid input. From October to November you can expect to lose around half of your solar output, and from December to February you will rely mostly on a backup charge source such as an overnight grid charge or a generator. Battery capacity, inverter bypass and overload behaviour, and charging strategy all need to be designed around that winter shortfall. Keeping LiFePO4 batteries above roughly 20% charge also extends their life considerably.

Red flags: how solar and heat pump deals go wrong

Some installers are honest, but mis-selling in this industry is very common, easily marketed on platforms like Facebook or Google Ads and these can be expensive mistakes. These are the warning signs we see most often when we review quotes and inspect installations. If any of them sound familiar, get a second opinion before you sign or before you pay the final invoice.

Sales tactics and contracts

  • Pressure to sign on the day. Cold calls, doorstep visits, "today only" discounts and prices that rise if you wait are designed to stop you comparing quotes. A good installer will give you time to get the quote checked.
  • Fake grants and government schemes. Be wary of anyone claiming to work for the government or offering "free" solar. Genuine schemes are applied for through official channels, not through unsolicited calls or visits.
  • Large payments up front. Installers signed up to the Renewable Energy Consumer Code (RECC) can't take a deposit of more than 25% of the contract value. A demand for most or all of the money before installation is a red flag, and it's exactly how rogue firms take deposits and disappear.
  • Assuming you can cancel. Consumers usually get a 14-day cancellation period on contracts signed at home (however not always), but business-to-business contracts generally don't (they use this in person signing to scam people all the time.). Once a business signs, there may be no way back, so read everything first.
  • Long roof leases and power purchase agreements. "Free solar" and rent-a-roof deals lease your roof to the provider for up to 25 years, and have caused refused mortgages and collapsed property sales. Commercial power purchase agreements (PPAs) typically run 15 to 25 years, can include annual price rises, may need an expensive buy-out if you sell or move, and can outlast your lease on the building. You also lose the tax relief you'd get from owning the equipment.

Inflated promises and impossible figures

  • Generation figures that can't be achieved. Estimates should be based on the MCS method for your location, roof direction, pitch and shading. Figures well above that, or a quote with no shading assessment at all, should be questioned.
  • "Zero bills" and fast payback claims. Watch for savings that assume you use every unit you generate, that prices rise steeply every year, or that ignore the winter. The Financial Ombudsman has upheld many complaints where finance repayments were higher than the savings people were promised.
  • Export income oversold. The (worthwhile) Feed-in Tariff closed to new applicants in 2019. Its replacement, the Smart Export Guarantee, pays whatever each supplier chooses, from a 1 to 15p per kWh (with Max limit of 3.68kW for homes commonly gives you £70 to £90 per year pay back in reality) usually around 4p SEG rate in 2026, which is usually far less than expected and not worth the cost of the paperwork or equipment. You'll also need an MCS-certified installation to claim it.
  • More panels sold for export that the grid won't take. Without approval from your network operator (DNO), export is limited to 3.68 kW per phase, and under G99 the DNO can set a lower cap however many panels you have. Extra panels can still make sense for winter output or charging batteries, but not as an export income stream.

The wrong design for your site

  • Panels on the wrong roof. A north-facing roof produces roughly 50 to 60% of what the same panels would produce facing south, while east and west roofs manage around 80 to 85%. Using the north side when a better option exists is poor design.
  • A system sized to the sale, not to your usage. Examples include batteries far larger than you can fill from solar or cheap-rate charging, or a large system where a smaller one would pay back sooner. The design should start from your actual consumption data.
  • No backup when you thought you had it. A standard grid-tied inverter shuts down in a power cut, even with a battery. If backup power was a reason for buying, the inverter needs a proper backup or off-grid output, and the wiring has to be designed for it.
  • Mismatched components. Panel strings outside the inverter's voltage or current limits, or an inverter too small for the array or the battery, will lose energy or shorten equipment life.

Cheap, outdated or unnecessary equipment

  • Unbranded or unknown equipment. If the quote doesn't name the make and model of every panel, inverter and battery, or the manufacturer has no UK support, the warranty may be worthless in practice.
  • Old battery technology. Lead-acid, leisure or marine batteries should only be run down to about 50% and last a few hundred cycles at that depth. LiFePO4 batteries routinely deliver 80 to 90% of their capacity for thousands of cycles. Lead-acid has no place in a modern building installation.
  • 12 V and 24 V systems. At low voltage, the same power needs far higher current, meaning heavy cables, more losses and more heat at every connection. Building-scale or practically any modern storage should be 48 V (51.2 V nominal) LiFePO4 or a high-voltage battery system. Getting advise from ill informed people or some YouTube channels leads to people wasting money, ineffective systems and dangerous outcomes. Be very careful who gives you advise. People looking for smaller systems should simply go with portable power stations (Anker/Bluetti/EcoFlow/Jackery), which are very safe, effective and do a complete job for minimal expense with optional solar panels and backup UPS functions on many - the Bluetti Apex 300 is extremely capable.
  • Low-efficiency or old-stock panels. Current mainstream panels exceed 20% efficiency. Lower-efficiency panels need more roof space for the same output.
  • Optimisers where they aren't needed. Panel optimisers (expensive up-sells) claim to help with shading, mixed roof directions or where panel-level shutdown is required but almost all modern panels have this feature built into the panel already, so it is quite literally a scam with huge profit margins.
  • Expensive extras with no clear benefit. Ask what each add-on actually does for you, and what it would cost to leave it out.

Unsafe or poor installation

  • Batteries in unsafe locations. Since the latest update to the Wiring Regulations (BS 7671 Amendment 4, 2026), batteries in dwellings must follow PAS 63100. This rules out lofts, roof spaces, escape routes such as hallways and stairs, and spaces opening into rooms where people sleep. On business premises, battery location should be covered by your fire risk assessment, with ventilation, fire detection and easy access to isolate.
  • Poor DC isolators and connectors. Most solar fires in the UK start on the DC side, usually at isolators and connectors, and poor installation is the main cause. Mixing different brands of "MC4-compatible" connectors is prohibited under MCS rules, and isolators must be rated for DC use.
  • Connections not torqued correctly. Battery terminals, busbars and inverter terminals must be tightened to the manufacturer's torque settings. Loose connections heat up and can arc, often months after installation.
  • Incorrect wiring and protection. Look out for undersized cables, missing or wrongly rated fuses between battery and inverter, the wrong type of RCD, and earthing that hasn't been designed for backup or off-grid operation.
  • Roof damage and no structural check. Cracked tiles, poorly sealed fixings and no check on roof loading cause problems for years, especially on flat commercial roofs.
  • Missing paperwork. You should receive an MCS certificate, an electrical installation certificate, confirmation of DNO notification or approval (G98 or G99), commissioning and test results, and all warranties. Without them you may not be able to claim export payments, and you can run into trouble with insurance or selling the property.

Heat pump red flags

  • No room-by-room heat loss calculation. Proper heat pump design, as MCS standards require, starts with a room-by-room heat loss calculation. A size picked from the old boiler's rating or the floor area is guesswork.
  • The wrong size of heat pump. An oversized unit costs more and cycles on and off, which wears the compressor and cuts efficiency. An undersized one can't keep up in cold weather and leans on expensive electric backup heating.
  • Replacing every radiator by default. Heat pumps run at lower water temperatures, so some rooms may need a larger radiator, but rarely all of them. The heat loss calculation shows which rooms need it. Without that evidence, a full radiator replacement is cost you may not need.
  • A high design flow temperature to avoid the work. Running at 55°C or more to avoid upgrading emitters makes the heat pump much less efficient and more expensive to run. The quote should state the design flow temperature and the expected seasonal efficiency (SCOP).
  • The grant not shown clearly. The Boiler Upgrade Scheme gives £7,500 off an air or ground source heat pump in England and Wales, or £9,000 for properties moving off oil or LPG. Homeowners and small businesses are eligible, the installer must be MCS-certified, and the grant should appear as a deduction on the quote. Compare the price before the grant with other quotes too.

After installation

  • Unsolicited upgrade, inspection or maintenance calls. People who already have solar are targeted by firms offering unnecessary upgrades, fake grants or "safety checks". Some of these firms take the money and never do the work, and police and Trading Standards have issued warnings about them.
  • Warranties that die with the installer. If the installer goes out of business (most of them close down their limited company and restart under a new name, shaking off bad reviews and warranties), an uninsured workmanship warranty goes with it too. Ask whether the warranty is insurance-backed and ideally a company that has existed for 5 years or more.

Not sure whether your quote or installation has any of these problems? Send it to us. We'll tell you what's right, what's wrong and what to ask your installer, with no installer ties and nothing to sell you.

Off-grid solar management software

We've developed our own advanced off-grid solar management software, built from hands-on experience designing and running off-grid systems in the UK. It manages solar, battery and charging behaviour together so a site gets the most from its stored energy all year round. Contact us to find out more or arrange a demonstration.

Spotted a red flag? Get it checked

Independent advice before you sign, or an inspection after it's fitted. Sales lines are open 9:30 to 5:30 and critical support is available 24/7.

Get in touch